Sampling Details
Sub Type: Other Special Feature: Location:
Area: 1696 Volume (gallons): 52000 Flow measure reading (gpm): Minimum required flow (gpm): 109
Disinfectant: Sodium Hypochlorite Secondary Disinfectant: ORP: Turnover Rate (min): 480
Total Chlorine (ppm): 3 Free Chlorine (ppm): 3 Combined Chlorine (ppm): 0 Total Bromine (ppm):
Alkalinity (ppm): Pool water temp ˚F: 83 pH: 7.2 Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): 74 Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(a) / Outlet covers shall be installed/secured/in compliance
Critical Repeat The two (2) main drain covers needed to be replaced in 2012.
Replace the drain covers to verify VGB Compliance.
3701-31-04 (B)(6)(k) / Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Critical Repeat The two (2) main drain covers needed to be replaced in 2012.
Replace the drain covers to verify VGB compliance.


Inspection Information


[?] Facility Type: Pool

[?] Inspection Type: Follow-up

[?] Inspection Date: 30-August-2018

The following violation(s) have been corrected since the last inspection.
3701-31-04 (B)(6)(o)/Ladders/stairs/steps are in good repair/slip resistent
The bottom step of a five (5) foot end ladder is damaged.
Repair or replace the damaged step. Correct By: 30-Aug-2018
3701-31-04 (C)(2)/pH is within 7.2 to 7.8
The pool pH was noted at 6.8. Fourteen (14) drops of Base Demand increased the pH to 7.2.
Increase and maintain the pool pH between 7.2-7.8. Correct By: 30-Aug-2018
Comments
All violations scheduled to be corrected, were corrected.
Thanks!
Pool Notes: The report was emailed to Ms. Butts.
Contact Scott Bradley,R.S. (732-7614) with any questions.