Sampling Details | |||
---|---|---|---|
Sub Type: Other | Special Feature: | Location: | |
Area: 1696 | Volume (gallons): 52000 | Flow measure reading (gpm): | Minimum required flow (gpm): 109 |
Disinfectant: Sodium Hypochlorite | Secondary Disinfectant: | ORP: | Turnover Rate (min): 480 |
Total Chlorine (ppm): 3 | Free Chlorine (ppm): 3 | Combined Chlorine (ppm): 0 | Total Bromine (ppm): |
Alkalinity (ppm): | Pool water temp ˚F: 83 | pH: 7.2 | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): 74 | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(1)(a) / Outlet covers shall be installed/secured/in compliance
Critical Repeat The two (2) main drain covers needed to be replaced in 2012.
Replace the drain covers to verify VGB Compliance.
3701-31-04 (B)(6)(k) / Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Critical Repeat The two (2) main drain covers needed to be replaced in 2012.
Replace the drain covers to verify VGB compliance.
The following violation(s) have been corrected since the last inspection. |
---|
3701-31-04 (B)(6)(o)/Ladders/stairs/steps are in good repair/slip resistent The bottom step of a five (5) foot end ladder is damaged. Repair or replace the damaged step. Correct By: 30-Aug-2018 |
3701-31-04 (C)(2)/pH is within 7.2 to 7.8 The pool pH was noted at 6.8. Fourteen (14) drops of Base Demand increased the pH to 7.2. Increase and maintain the pool pH between 7.2-7.8. Correct By: 30-Aug-2018 |
Comments |
---|
All violations scheduled to be corrected, were corrected. Thanks! Pool Notes: The report was emailed to Ms. Butts. Contact Scott Bradley,R.S. (732-7614) with any questions. |