Sampling Details
Sub Type: School Special Feature: Location:
Area: 1800 Volume (gallons): 65000 Flow measure reading (gpm): Minimum required flow (gpm):
Disinfectant: Secondary Disinfectant: ORP: Turnover Rate (min):
Total Chlorine (ppm): Free Chlorine (ppm): Combined Chlorine (ppm): Total Bromine (ppm):
Alkalinity (ppm): Pool water temp ˚F: pH: Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


[?] Facility Type: Public School

[?] Inspection Type: Follow-up

[?] Inspection Date: 21-February-2014

The following violation(s) have been corrected since the last inspection.
3701-31-04 (B)(1)(e)/Automatic Chemical Controller (ACC) is functioning properly
Automatic Chemical Controller (ACC) was not functioning properly at the time of the inspection. The pH on the auto controller was noted at 7.5.
Calibrate the unit. Correct By: 10-Feb-2014
3701-31-04 (C)(2)/pH is within 7.2 to 7.8
The pool pH was noted at 7.0.
Raise the pH to between 7.2-7.8. Correct By: 10-Feb-2014
3701-31-04 (C)(3)/Total alkalinity is at or greater than 60 ppm
The pool total alkalinity was noted at 40ppm
Raise the total alkalinity to at least 60 ppm. Correct By: 10-Feb-2014
3701-31-04 (C)(6)/Pool water temperature does not exceed 90 degrees Fahrenheit without approval from the Director
The pool water temperature was noted at 92°F.
Lower the pool water temperature below 90°F. Correct By: 10-Feb-2014
3701-31-04 (D)(6)(a)/Pool free chlorine disinfectant residual is above 1 ppm.
The pool free chhlorine level was noted at 0ppm.
Raise the pool free chlorine level above 1.0ppm minimum. Correct By: 10-Feb-2014
Comments
All violations corrected.
Thanks!
1. Due to pool building structural issues, the pool is closed. According to Mr. Taylor, the pool is to remain closed until August.
2. Since water has been drained from the pool, no chemistry levels were taken.
3. The 2/10/14 reinspection was rescheduled.
Reinspection conducted by Scott Bradley,R.S. 732-7614