Sampling Details | |||
---|---|---|---|
Sub Type: Hotel/motel | Special Feature: | Location: | |
Area: 490 | Volume (gallons): 12795 | Flow measure reading (gpm): | Minimum required flow (gpm): |
Disinfectant: | Secondary Disinfectant: | ORP: | Turnover Rate (min): |
Total Chlorine (ppm): | Free Chlorine (ppm): | Combined Chlorine (ppm): | Total Bromine (ppm): |
Alkalinity (ppm): | Pool water temp ˚F: | pH: | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
The following violation(s) have been corrected since the last inspection. |
---|
3701-31-04 (B)(6)(h)/Required meters and gauges maintained/functional Required meters and gauges were not maintained or were not functional while the pool is in operation. Flow meter was not working. Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. Ensure replacement flow meter has an appropriate range for the pool size (ideally between 0-100 gpm.) |
3701-31-04 (D)(7)(b)/pH and ORP values shall be displayed. ORP value was not displayed on the ACC unit Have the ACC unit serviced or replaced so that the ORP value is displayed |
3701-31-04 (E)(2)(e)/Working emergency telephone/call box provided. Emergency device (telephone) was not working. Ensure that the emergency device is functioning properly and rings to the emergency response authorities. |
Comments |
---|
Thank you for making the corrections! |