Sampling Details | |||
---|---|---|---|
Sub Type: Spray Ground | Special Feature: | Location: | |
Area: 17 | Volume (gallons): 600 | Flow measure reading (gpm): 40 | Minimum required flow (gpm): 20 |
Disinfectant: Sodium Hypochlorite | Secondary Disinfectant: | ORP: 805 | Turnover Rate (min): 30 |
Total Chlorine (ppm): 2 | Free Chlorine (ppm): 2 | Combined Chlorine (ppm): 0 | Total Bromine (ppm): |
Alkalinity (ppm): 70 | Pool water temp ˚F: 85 | pH: 70.0 | Cyanuric acid (ppm): 0 |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): 44 | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(4)(a)(iv) / Water temperatures are recorded daily
Water temperatures were not being recorded daily.
Take and record the water temperature at least once/day.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow (or pressure) and automatic pump shut off switches were not tested monthly as required. Onsite records indicate that the ACC was last tested on May 28, 2016.
Test the ACC monthly or more frequently per manufacturer's requirements and record test results in daily pool operation reports. NOTE: switches were tested by this inspector during this inspection and found to be functioning properly.
Comments |
---|
Facility inspection notes: Water clarity disinfectant residuals and water quality readings meet minimum code requirements at this time. Flow switch /APSOS tested during inspection and found to be functioning satisfactorily. System is well-maintained at this time. Keep up the good work and thanks for a great 2016 pool season. NOTE: If Sprayground continues to operate through the month of September, the mixing-holding tank must be drained and cleaned by September 11 (120 days since activation on May 15) in accordance with code requirements. |