Sampling Details | |||
---|---|---|---|
Sub Type: Other | Special Feature: | Location: | |
Area: 1800 | Volume (gallons): 54000 | Flow measure reading (gpm): | Minimum required flow (gpm): |
Disinfectant: | Secondary Disinfectant: | ORP: | Turnover Rate (min): |
Total Chlorine (ppm): | Free Chlorine (ppm): | Combined Chlorine (ppm): | Total Bromine (ppm): |
Alkalinity (ppm): | Pool water temp ˚F: | pH: | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(1)(a) / Outlet covers shall be installed/secured/in compliance
Critical Repeat The pool main drain covers have passed the seven (7) year replacement of 2016.
Replace the main drain covers to verify VGB compliance.
3701-31-04 (B)(4)(a)(vi) / Total alkalinity is tested weekly
Repeat Total alkalinity was not tested weekly.
Test, then record the pool total alkalinity at least once per week.
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat Weirs are missing from the skimmer baskets.
Replace the missing weirs.
3701-31-04 (B)(6)(k) / Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Critical Repeat The pool main drain covers have passed the seven (7) year replacement of 2016.
Replace the main drain covers to verify VGB compliance.
The following violation(s) have been corrected since the last inspection. |
---|
3701-31-04 (B)(6)(s)/Perimeter barrier is in good repair to prevent unauthorized entry The pool entrance gate is not self closing. Repair the entrance gate so it is self closing. Correct By: 27-Jun-2018 |
Comments |
---|
All other violations corrected. Thanks! Pool Notes: 1. The inspection was conducted as a follow-up to a standard inspection conducted on 6/20/18. 2. The report was emailed to Mr. Hooker Contact Scott Bradley,R.S. (732-7614) with any questions. |