Sampling Details | |||
---|---|---|---|
Sub Type: Other | Special Feature: | Location: | |
Area: 1800 | Volume (gallons): 54000 | Flow measure reading (gpm): 100 | Minimum required flow (gpm): 113 |
Disinfectant: Sodium Hypochlorite | Secondary Disinfectant: | ORP: | Turnover Rate (min): 480 |
Total Chlorine (ppm): 2 | Free Chlorine (ppm): 2 | Combined Chlorine (ppm): 0 | Total Bromine (ppm): |
Alkalinity (ppm): 110 | Pool water temp ˚F: 83 | pH: 7.4 | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(1)(a) / Outlet covers shall be installed/secured/in compliance
Critical Repeat The pool main drain covers have passed the seven (7) year replacement of 2016.
Replace the main drain covers to verify VGB compliance.
3701-31-04 (B)(4)(a)(vi) / Total alkalinity is tested weekly
Repeat Total alkalinity was not tested weekly.
Test, then record the pool total alkalinity at least once per week.
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Weirs are missing from the skimmer baskets.
Replace the missing weirs.
3701-31-04 (B)(6)(k) / Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Critical Repeat The pool main drain covers have passed the seven (7) year replacement of 2016.
Replace the main drain covers to verify VGB compliance.
3701-31-04 (B)(6)(s) / Perimeter barrier is in good repair to prevent unauthorized entry
Repeat The pool entrance gate is not self closing.
Repair the entrance gate so it is self closing. Correct By: 27-Jun-2018
Comments |
---|
Pool Notes: 1. The pool water is clear. 2. Pool turnover rate noted at 9 hours. For an eight (8) hour turnover, a flow rate of 113gpm is recommended. 3. One (1) lifeguard was on duty during the inspection. 4. The 2018 pool license is posted. 5. The report was emailed to Mr. Hooker Contact Scott Bradley,R.S. (732-7614) with any questions. |