Sampling Details
Sub Type: School Special Feature: Location:
Area: 1800 Volume (gallons): 65000 Flow measure reading (gpm): Minimum required flow (gpm): 168
Disinfectant: Sodium Hypochlorite Secondary Disinfectant: ORP: 180 Turnover Rate (min):
Total Chlorine (ppm): 0 Free Chlorine (ppm): 0 Combined Chlorine (ppm): 0 Total Bromine (ppm):
Alkalinity (ppm): Pool water temp ˚F: 88 pH: 8.0 Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
ORP reading was below 650 mv. Per JT they are replacing unit.
Have the ACC unit inspected to determined why the ORP is low.
3701-31-04 (B)(1)(c) / Minimum disinfection residual shall be maintained as required.
Critical Chlorine disinfectant residual was less than 1 ppm for the pool
Do not operate the pool when the disinfectant residuals are less than what is required. Ensure the chlorine disinfectant residual is at 1 ppm or above prior to placing the pool back into operation.
3701-31-04 (B)(1)(e) / Automatic Chemical Controller (ACC) shall function properly.
Critical Automatic Chemical Controller (ACC) was not functioning properly at the time of the inspection
Do not operate the pool when the ACC unit is not functioning properly. Ensure that the ACC unit is functioning properly prior to placing the pool back into operation.
3701-31-04 (C)(2) / pH is within 7.2 to 7.8
pH was outside the range of 7.2 to 7.8.
Treat the pool water so that the pH is within the acceptable range.
3701-31-04(D)(6)(a)(2) / Pool free chlorine disinfectant residual shall be above 1 ppm.
Critical Pool free chlorine disinfectant residual was below 1 ppm.
Do not operate the pool until the chlorine disinfectant residual is at 1 ppm or above.


Inspection Information


[?] Facility Type: Pool

[?] Inspection Type: Standard

[?] Inspection Date: 26-May-2021

Comments
Pool Notes:
-Pool was closed at time of inspection and had not be used in the last two weeks.
-School wont be using pool till late July after alterations are finished.
-Facility is planning on draining the pool this week.
-Updates will be made to pool pump room, ensure to submit alterations to ODH.
-Re-inspection to confirm pool has been drained.