Sampling Details | |||
---|---|---|---|
Sub Type: School | Special Feature: | Location: | |
Area: 1800 | Volume (gallons): 65000 | Flow measure reading (gpm): | Minimum required flow (gpm): 168 |
Disinfectant: Sodium Hypochlorite | Secondary Disinfectant: | ORP: 750 | Turnover Rate (min): 480 |
Total Chlorine (ppm): 3 | Free Chlorine (ppm): 3 | Combined Chlorine (ppm): 0 | Total Bromine (ppm): |
Alkalinity (ppm): 60 | Pool water temp ˚F: 87 | pH: 7.7 | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat The pool filter system flow meter is not working. Repair the flow meter so pool water turnover rates can be determined.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. Correct By: 30-Apr-2019 3701-31-04 (D)(7)(c) / Audible/visual alarm shall activate when unit is malfunctioning or when pH or ORP levels are not acceptable.
Critical The ACC unit alarm could not be tested. Determine a way to test the ACC unit alarm so it can be tested.
Have the ACC unit serviced or replaced so that the audible or visual alarm is activated when necessary. Correct By: 30-Apr-2019 3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Repeat ACC unit alarm testing is not documented. Documented monthly ACC unit alarm testing.
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly. Correct By: 30-Apr-2019
Comments |
---|
Pool Notes: 1. Filter pressure gauges noted at 16 and 18psi. 2. The pool water is clear. 3. The pool pH was between 7.6 and 7.8. 4. ACC unit pH noted at 7.5 5. The pool pump was changed. Equipment inventory was updated. 6. The report was emailed to the facility. Inspection conducted by Scott Bradley,R.S. 732-7614 |
James Taylor |