Sampling Details
Sub Type: Hotel/motel Special Feature: Location:
Area: 418 Volume (gallons): 12500 Flow measure reading (gpm): 50 Minimum required flow (gpm): 26
Disinfectant: Salt Secondary Disinfectant: ORP: 775 Turnover Rate (min):
Total Chlorine (ppm): 4 Free Chlorine (ppm): 4 Combined Chlorine (ppm): 0 Total Bromine (ppm):
Alkalinity (ppm): 90 Pool water temp ˚F: 81 pH: 7.6 Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6) / Equipment is maintained per manufacturers specifications.
Repeat Equipment was not maintained per manufacturers specifications. Missing skimmer weirs.
All equipment must be maintained in accordance with the manufacturers specifications.


Inspection Information


[?] Facility Type: Pool

[?] Inspection Type: Follow-up

[?] Inspection Date: 20-January-2023

The following violation(s) have been corrected since the last inspection.
3701-31-04 (E)(2)(d)/First aid kit provided
First aid equipment was not provided.
Provide first aid equipment, including a first aid kit, at the pool at all times. Ensure first aid kit is stocked with gloves.
3701-31-04(D)(6)(a)(2)/Pool free chlorine disinfectant residual shall be above 1 ppm.
Pool free chlorine disinfectant residual was noted at 0 ppm.
Do not operate the pool until the chlorine disinfectant residual is at 1 ppm or above.
3701-31-04 (D)(7)(d)/Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.
Comments
Inspection Notes:

1. Follow up inspection conducted on 1/20/2023.
2. First aid kit was properly stocked.
3. Chlorine levels met required standards.