Sampling Details
Sub Type: MHP Special Feature: Location:
Area: 800 Volume (gallons): 32000 Flow measure reading (gpm): 50 Minimum required flow (gpm): 67
Disinfectant: Di/Tri-Chloro Secondary Disinfectant: ORP: Turnover Rate (min): 640
Total Chlorine (ppm): 2.5 Free Chlorine (ppm): 2 Combined Chlorine (ppm): 0.5 Total Bromine (ppm):
Alkalinity (ppm): 100 Pool water temp ˚F: 85 pH: 7.3 Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(4)(a)(iv) / Water temperatures are recorded daily
Repeat Water temperatures were not being recorded daily.
Take and record the water temperature at least once/day.
3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met. Observed pool to be at a flow rate of 50gpm, which is below required flow rate to meet 480 minute turnover rate.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.


Inspection Information


[?] Facility Type: Pool

[?] Inspection Type: Follow-up

[?] Inspection Date: 24-August-2021

The following violation(s) have been corrected since the last inspection.
3701-31-04 (B)(1)(c)/Minimum disinfection residual shall be maintained as required.
Chlorine disinfectant residual was less than 1 ppm for the pool
Do not operate the pool when the disinfectant residuals are less than what is required. Ensure the chlorine disinfectant residual is at 1 ppm or above prior to placing the pool back into operation.
3701-31-04 (C)(2)/pH is within 7.2 to 7.8
pH was outside the range of 7.2 to 7.8. Observed pH at 8.
Treat the pool water so that the pH is within the acceptable range.
Comments
Water chemistry observed to be within requirements.
Ensure turnover rate is sufficient--flow rate should be 67gpm.