Sampling Details | |||
---|---|---|---|
Sub Type: Wading Pool | Special Feature: | Location: | |
Area: 225 | Volume (gallons): 2531 | Flow measure reading (gpm): 70 | Minimum required flow (gpm): 21 |
Disinfectant: Sodium Hypochlorite | Secondary Disinfectant: | ORP: | Turnover Rate (min): 36 |
Total Chlorine (ppm): 9 | Free Chlorine (ppm): 9 | Combined Chlorine (ppm): 0 | Total Bromine (ppm): |
Alkalinity (ppm): 80 | Pool water temp ˚F: 70 | pH: 7.7 | Cyanuric acid (ppm): |
Spa water temp ˚F: | Spa water replaced every 30 days: | Max Allow. Filter Flow (gpm): | Max Allow. Flow: Jet pump capacity (gpm): |
Max Allow. Flow: SF pump capacity (gpm): |
3701-31-04 (B)(4)(a)(i) / Disinfection residuals are tested daily at pool side at required intervals for pools/automatic chemical controllers/special features
Disinfection residuals were not tested daily at pool side and/or at the required intervals for pools. ACC was not hooked up at all.
Test the disinfection residual every day before bathers enter the water. Disinfection residual must then be tested every 4 hours when an ACC is not properly in use. If an ACC is in use the disinfectant residual must be tested every 12 hours while the pool is in use.
3701-31-04 (B)(4)(a)(iv) / Water temperatures are recorded daily
Water temperatures were not being recorded daily.
Take and record the water temperature at least once/day.
3701-31-04 (B)(4)(a)(vi) / Total alkalinity is tested weekly
Total alkalinity was not tested weekly.
Test total alkalinity at least once/week.
3701-31-04 (B)(6) / Equipment is maintained per manufacturers specifications.
Equipment was not maintained per manufacturers specifications. ACC was not properly working or plugged in.
All equipment must be maintained in accordance with the manufacturers specifications.
Comments |
---|
Notes: -Pool water clear and meeting code requirements. -ACC was not properly hooked up at time of inspection a follow up will be conducted on 6/28/2023 per CCPH's policy. Inspection report was re-sent to operator on 6/21/23. |