Sampling Details
Sub Type: Other Special Feature: Location:
Area: 1840 Volume (gallons): 62400 Flow measure reading (gpm): Minimum required flow (gpm): 130
Disinfectant: Sodium Hypochlorite Secondary Disinfectant: ORP: 674 Turnover Rate (min):
Total Chlorine (ppm): 3 Free Chlorine (ppm): 4 Combined Chlorine (ppm): 1 Total Bromine (ppm):
Alkalinity (ppm): 140 Pool water temp ˚F: 80 pH: 8.0 Cyanuric acid (ppm):
Spa water temp ˚F: Spa water replaced every 30 days: Max Allow. Filter Flow (gpm): Max Allow. Flow: Jet pump capacity (gpm):
Max Allow. Flow: SF pump capacity (gpm):
[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(4)(a)(iv) / Water temperatures are recorded daily
Repeat Water temperatures were not being recorded daily.
Take and record the water temperature at least once/day.
3701-31-04 (B)(4)(c) / SVRS/APSOS/ACC test results/ service records are maintained
Repeat ACC test results/ service records were not maintained.
The test results/service records for these devices must be kept on site for review. If the device has not been recently serviced, have the device tested immediately and provide documentation of the test results.
3701-31-04 (C)(2) / pH is within 7.2 to 7.8
Repeat pH was outside the range of 7.2 to 7.8. Observed pool water at a pH of 8.
Treat the pool water so that the pH is within the acceptable range.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.


Inspection Information


[?] Facility Type: Pool

[?] Inspection Type: Standard

[?] Inspection Date: 30-June-2021

Comments
1. Observed pH at 8. Ensure pH is within range of 7.2-7.8.
2. Ensure flow meter is fixed so that flow rate can be determined.
3. Observed different pump; ensure Equipment Replacement Notification form is sent to ODH for approval.
4. Ensure temperature and water clarity are being recorded daily, and that ACC unit/shutoff is being tested weekly and recorded.