Inspection Information
Facility Name: RIVERSIDE PARK - SPLASH
Facility Type: Special Use
[?] Inspection type: Standard
Inspection date: 14-June-2018
Violations: A summary of the violations found during the inspection are listed below.
3701-31-04 (B)(6)(h)
Repeat Required meters and gauges were not maintained or were not functional while the pool is in operation. Flow meter is not accurate because the float is in upside down.
Maintain all meters and gauges in a properly funtioning manner at all times while the pool is in operation.
3701-31-04 (C)(3)
Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm.
3701-31-04 (D)(7)(d)
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly. Flow switch does not appear to be operating correctly.
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.
Comments
Flow switch does not appear to be operating correctly. Float of flow meter is in upside down and needs to be repaired so it is accurate. Have these items corrected prior to next inspection in 3-4 weeks.


Inspection Outcome: