No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
Inspection Type: Standard
Inspection Date: 22-January-2015
Comments |
---|
At the time of inspection, I have noticed proper flow rate, water quality and water clarity parameters at the pool. Overall, the operator has complied with the pool state rules at the present time. Finally, safety valve release system has been installed at the pool, by the operator. |