3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Turnover rate observed at 65 gpm. Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
Facility Type: Pool
Inspection Type: Standard
Inspection Date: 24-July-2023
Comments |
---|
Ensure signage is not blocked. |