3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
Facility Type: Pool
Inspection Type: Standard
Inspection Date: 19-August-2019
Comments |
---|
Chlorine was reading 1ppm at time of inspection recommend increasing chlorine to at least 3-5ppm. |