[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Corrected During Inspection Required turnover rates were not met. At time of inspection observed a flow rate of less than 40 gpm, however, the mininum requirement is 43 gpm. Operator was able to correct the flow rate back to 43 gpm at time of inspection.

3701-31-04 (B)(6)(s) / Perimeter barrier is in good repair to prevent unauthorized entry
Repeat Observed perimeter barrier in disrepair behind the old pump room and across from the tube storage for the lazy river. Bottom portions of the fence in these areas may present gaps greater than 4-inches.


Inspection Information


Facility Type: Pool

Inspection Type: Follow-up

Inspection Date: 05-June-2023

The following violation(s) have been corrected since the last inspection.
Comments
At time of inspection, a free chlorine residual of 5 ppm (requirement is 2 ppm) was obtained from an orifice of the spray ground.