3701-31-04 (B)(1)(d) / Circulation/Disinfection system shall operate properly.
Critical Pump was not operating at time of inspection and operator reported that it had been down for 2 days. The operator closed the pool to swimmers at time of inspection.
Facility Type: Pool
Inspection Type: Standard
Inspection Date: 31-December-2015
Comments |
---|
Pump is not operating at time of inspection. Operator chose to voluntarily close the pool until the new pump is installed. |