3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met. At time of inspection observed a flow rate of 40 gpm, however, the mininum requirement is 43 gpm.
3701-31-04 (B)(6)(s) / Perimeter barrier is in good repair to prevent unauthorized entry
Repeat Observed perimeter barrier in disrepair behind the old pump room and across from the tube storage for the lazy river. Bottom portions of the fence in these areas may present gaps greater than 4-inches.
Facility Type: Pool
Inspection Type: Standard
Inspection Date: 01-June-2023
Comments |
---|
Spray ground was not open at time of inspection. Disinfectant levels of approximately 1ppm free chlorine were observed, however, 2 ppm free chlorine is the minimum requirement. If these disinfection levels cannot be maintained, the spray ground shall remain closed. A follow-up inspection will be completed to evaluate this. Recommend improving the required signage posted for the spray ground. |