[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not tested monthly
Provide records indicating that the unit is being tested monthly. TEST AND RECORD THE ACC FLOW SWITCH FUNCTION TEST MONTHLY. SEND ME A COPY OF THE RECORD SHEET WITH THE TEST RESULTS WITHIN 7 DAYS. Correct By: 09-May-2019

3701-31-04 (A) / All construction or alterations of a public swimming pool are approved
Repeat ODH has not recorded receipt of ERN for the replacement of the disinfectant chemical pump.
SUBMIT ERN TO ODH FOR THE DISINFECTANT PUMP REPLACEMENT. REPORTEDLY THIS HAS BEEN DONE


Inspection Information


Facility Type: Spa

[?] Inspection Type: Follow-up

Inspection Date: 02-May-2019


Comments
-ERN reportedly has been send to ODH
-daily records are kept, but the ACC flow switch test is not recorded
-equalizer is plugged
-ACC appears to be functioning properly.
REMEMBER TO DRAIN THE SPA EVERY 30 DAYS.