[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (A) / Approval shall be obtained for any construction or alterations of a public swimming pool.
Repeat Equipment, at a public swimming pool, was changed/altered without obtaining approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN).
Obtain approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN) before operating pool. SUBMIT AN ERN FOR THE REPLACEMENT OF THE CIRCULATION PUMP. Correct By: 05-Jul-2023
3701-31-04 (B)(6) / Equipment is maintained per manufacturers specifications.
Equipment was not maintained per manufacturers specifications. Weirs are missing in the skimmers.
All equipment must be maintained in accordance with the manufacturers specifications. INSTALL WEIRS IN THE SKIMMERS. Correct By: 05-Jul-2023
3701-31-04 (C)(2) / pH is within 7.2 to 7.8
pH was outside the range of 7.2 to 7.8.
Treat the pool water so that the pH is within the acceptable range. ADJUST pH Correct By: 30-Jun-2023
3701-31-04 (D)(05) / Cyanuric acid level shall not exceed 70 ppm.
Cyanuric acid level exceeded 70 ppm
Drain the pool at least halfway and fill with clean water. Monitor the amount of cyanuric acid being used and adjust accordingly. LOWER CYA Correct By: 05-Jul-2023
3701-31-04 (E)(2)(a)(i) / 12 ft. non-telescopic reach pole with shepherd's crook is provided
12 ft. non-telescopic reach pole with shepherd's crook was not provided at the unguarded pool. Reach pole is only 10 ft long.
Provide a 12 ft. non-telescopic reach pole in the pool area at all times. PLACE THE SHEPHERD'S CROOK ON A 12 FT POLE. Correct By: 05-Jul-2023
3701-31-04 (E)(2)(a)(ii) / A USCG Type IV personal flotation device with 30 -60 foot throw line provided
A USCG Type IV personal flotation device with 30 -60 foot throw line was not provided at the unguarded pool.
Provide a proper floatation device at all times. KEEP THE RING BUOY IN THEE POOL AREA.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 28-June-2023


Comments
When using CYA (cyanuric acid) the alkalinity level is calculated by subtracting 1/3 the CYA level from the alkalinity reading. EXAMPLE: alkalinity test reading = 70 ppm, CYA = 60 ppm. Alkalinity is 70 ppm – (60/3) = 50 ppm

Documentation of the ASSE 1013 backflow preventer’s annual inspection is available at the pool facility for review. Inspected 5-23-23

Our records show that the main drain suction outlet covers (AquaStar WAV 12) were installed 8/7/2019. The covers have a 5 year life span and must be replaced before 8/7/2024.

Depth markings will need to be repainted for next year

MAKE SURE THAT THE EMERGENCY PHONE IS TURNED ON AND WORKING AND THAT GUARDS KNOW HOW IT WORKS.