[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.

3701-31-04 (B)(4)(c) / SVRS/APSOS/ACC test results/ service records are maintained
SVRS/APSOS/ACC test results/ service records were not maintained.
The test results/service records for these devices must be kept on site for review. If the device has not been recently serviced, have the device tested immediately and provide documentation of the test results.


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 10-March-2020