[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve. INCREASE FLOW RATE. A NEW PUMP MAY BE NEEDED OR A NEW IMPELLER IN THE PUMP MAY BE NEEDED.
3701-31-04 (C)(2) / pH is within 7.2 to 7.8
pH was outside the range of 7.2 to 7.8.
Treat the pool water so that the pH is within the acceptable range. ADJUST pH. pH CHEMICAL PUMP DOES NOT SEEN TO BE FUNCTIONING. Correct By: 21-Jul-2022


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 19-July-2022

Comments
A VACUUM BREAKER WAS INSTALLED ON THE HOSE BIB BY THE GATE AT THE TIME OF INSPECTION.