[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (A) / All construction or alterations of a public swimming pool are approved
The disinfection feeder was replaced. Reportedly the ERN was sent in last week.
I WILL RECHECK WITH ODH TO CONFIRM THAT THE ERN HAS BEEN SENT IN NEXT MONTH.
3701-31-04 (B)(4)(c) / SVRS/APSOS/ACC test results/ service records are maintained
SVRS/APSOS/ACC test results/ service records were not maintained.
The test results/service records for these devices must be kept on site for review. If the device has not been recently serviced, have the device tested immediately and provide documentation of the test results.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 03-July-2019

Comments
Corrections made since the 6-3-19 inspection
-reportedly the ERN has been sent in for the disinfection pump replacement
-test kit reagents are all fresh

RECHECK THE FLOW SWITCH ON THE ACC TO ENSURE IT IS FUNCTIONING PROPERLY. WHEN THE HEALTH INSPECTOR CHECKED IT IT DID NOT APPEAR TO BE FUNCTIONING.