[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve. INCREASE THE FLOW TO AT LEAST 635 GPM


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 16-August-2018

Comments
Corrections made since the last inspection dated 7-23-18
-the chlorine tank is labeled
-the ACC is tested monthly

REPORTEDLY, THE DRAIN COVERS ARE BEING REPLACED SOON. KEEP THE CERT OF COMPLIANCE AND POST A COPY IN THE FILTER ROOM WITH THE DATE OF INSTALLATION