3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Required flow meters was not functional while the pool is in operation.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation.
REPAIR THE FLOW METER. Correct By: 02-Mar-2019
3701-31-04 (E)(2)(a)(ii) / A USCG Type IV personal flotation device with 30 -60 foot throw line provided
Repeat A USCG Type IV personal flotation device with 30 -60 foot throw line was not provided at the unguarded pool.
Provide a proper floatation device at all times.
ATTACH A 30-60' ROPE ONTO THE RING BUOY. Correct By: 28-Feb-2019
3701-31-04 (E)(2)(d) / First aid kit provided
Repeat First aid equipment was not provided.
Provide first aid equipment, including a first aid kit, at the pool at all times.
SUPPLY A FIRST AID KIT AT THE POOL AREA OR POST A SIGN IN THE POOL AREA STATING THE LOCATION OF THE KIT IF IT IS KEPT AT THE FRONT DESK.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 28-February-2019
Comments |
---|
Corrections made since the last inspection dated 10-24-18. -alkalinity appears to be tested and recorded weekly -a weir is in the skimmer |