3701-31-04 (B)(6)(c) / Cross connection hazards shall be prevented.
Cross connection hazards were present. There are three hose bibs that are not backflow protected
Remove all cross connection hazards from the pool area.
PLACE ASSE 1011 BACKFLOW PREVENTERS ON THE THREE HOSE BIBS.
3701-31-04 (E)(2)(d) / First aid kit provided
Repeat First aid equipment was not provided.
Provide first aid equipment, including a first aid kit, at the pool at all times.
KEEP FIRST AID KIT AVAILABLE.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 10-July-2019
Comments |
---|
PLEASE ADDRESS THESE EASY TO FIX BUT CRITICAL SAFETY ITEMS. |