[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


Facility Type: Special Use

[?] Inspection Type: Standard

Inspection Date: 23-December-2014

Comments
ORP is not meeting the required minimum acceptable reading of 650 millivolts.