[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Repeat Flow or pressure switch was not tested monthly
Provide records indicating that the unit is being tested monthly. TEST AND RECORD ACC FLOW SWITCH FUNCTION MONTHLY.


Inspection Information


Facility Type: Special Use

[?] Inspection Type: Standard

Inspection Date: 20-December-2023