3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
CHECK FLOW RATE. INCREASE TO AT LEAST 959 GPM
Facility Type: Special Use
[?] Inspection Type: Standard
Inspection Date: 28-July-2018