[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Required meters and gauges were not maintained or were not functional while the pool is in operation.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. REPAIR THE PRESSURE GAUGE ON THE JET PUMP Correct By: 22-Dec-2023
3701-31-04 (C)(3) / Total alkalinity is at or greater than 60 ppm
Repeat Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Repeat Flow or pressure switch was not tested monthly
Provide records indicating that the unit is being tested monthly. TEST AND RECORD THE ACC FLOW SWITCH FUNCTION.


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 20-December-2023