[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (A) / Approval shall be obtained for any construction or alterations of a public swimming pool.
Public swimming pool was constructed, installed, or substantially altered without obtaining approval from the Ohio Department of Health (ODH).
Contact ODH to obtain approval for any construction/alterations before operating pool. SUBMIT AN ERN FOR THE REPLACEMENT OF THE DISINFECTION CHEMICAL FEEDER. Correct By: 21-Jun-2021
3701-31-04 (B)(6)(s) / Perimeter barrier is in good repair to prevent unauthorized entry
Perimeter barrier had gaps greater than 4 inches.
Repair the perimeter barrier so that there are not any gaps greater than 4 inches anywhere along the barrier. ATTACH THE CHAIN LINK TO THE BOTTOM OF THE POSTS. Correct By: 21-Jun-2021
3701-31-04 (B)(6)(s) / Perimeter barrier is in good repair to prevent unauthorized entry
Gates or doors were not self-closing and lockable.
Repair gates or doors in order to be self-closing and lockable. INSTALL A GATE AT THE FRONT ENTRANCE THAT IS SELF-CLOSING AND LATCHING. GATE MUST BE AT LEAST 48 INCHES FROM THE GROUND WITH GAPS NO MORE THAN 4 INCHES. THE OPENER MUST BE AT LEAST 38 INCHES FROM THE GROUND. Correct By: 17-Jul-2021
3701-31-04 (B)(6)(z) / Special features are maintained in good repair and according to manufacturer specifications.
Repeat Special features were not maintained in good repair or in accordance with the manufacturer specifications.
Repair/maintain all the special features in good repair and in accordance with the manufacturer's specifications. If necessary, replace broken components. REPLACE AND TIGHTEN LOOSE SCREWS ON SLIDE. Correct By: 21-Jun-2021


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 17-June-2021

Comments
RECORD THE WATER TEMPERATURE ON THE WEEKLY LOG SHEET DAILY.

KEEP A COPY OF THE CERTIFICATE OF COMPLIANCE AT THE FACILITY FOR REVIEW. YOU CAN POST A COPY IN THE EQUIPMENT.

The operator was observed performing onsite chemical tests appropriately