[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (A) / Approval shall be obtained for any construction or alterations of a public swimming pool.
Repeat Equipment, at a public swimming pool, was changed/altered without obtaining approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN).
Obtain approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN) before operating pool. SUBMIT AN ERN TO ODH FOR THE PUMP REPLACEMENT. Correct By: 13-Mar-2023
3701-31-04 (B)(4)(c) / SVRS/APSOS/ACC test results/ service records are maintained
Repeat SVRS test results were not maintained.
The test results/service records for these devices must be kept on site for review. TEST AND RECORD ON THE LOG SHEET THE SVRS FUNCTION.
3701-31-04 (C)(2) / pH is within 7.2 to 7.8
pH was outside the range of 7.2 to 7.8.
Treat the pool water so that the pH is within the acceptable range. ADJUST pH Correct By: 22-Mar-2023
3701-31-04 (C)(3) / Total alkalinity is at or greater than 60 ppm
Repeat Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm. ADJUST ALKALINITY Correct By: 08-Mar-2023


Inspection Information


Facility Type: Spa

[?] Inspection Type: Follow-up

Inspection Date: 20-March-2023

Comments
The circulation pump Sta-Rite PE5D-181L .75 HP was replaced with a Pentair Intelliflo VSF