[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(4)(a)(ii) / Combined chlorine is tested daily at pool side prior to use
Combined chlorine was not tested daily at pool side prior to use.
Test for combined chlorine prior to bathers entering the water and every 4 hours the pool is open for use. If ACC is in use combined chlorine must be tested every 12 hours while the pool is in use. For spraygrounds and spray features, the combined chlorine must be tested at 1 spray feature every 6 hours the sprayground or spray feature is in use. TEST AND RECORD THE FREE, COMBINE AND TOTAL CHLORINE EVERY 4 HOURS. Correct By: 28-Jun-2019
3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 26-June-2019

Comments
Our records have been updated to show: The main drain suction outlet cover (Waterway 640-472xV) was installed on 5-14-19. The cover has a 7 year life span and must be replaced before 5-14-26