3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. Check flowmeter.
Facility Type: Special Use
[?] Inspection Type: Standard
Inspection Date: 16-June-2017