[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. Check flowmeter.


Inspection Information


Facility Type: Special Use

[?] Inspection Type: Standard

Inspection Date: 16-June-2017