[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(e) / Automatic Chemical Controller (ACC) shall function properly.
Critical Automatic Chemical Controller (ACC) was not functioning properly at the time of the inspection -ACC controller did not alarm when a NO FLOW test was implimented.
Do not operate the pool when the ACC unit is not functioning properly. Ensure that the ACC unit is functioning properly prior to placing the pool back into operation.
3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met. -Observed flow rate at time of inspection at 90 gpm.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Follow-up

Inspection Date: 20-July-2022

Comments
Repairs have been made to the chemical feed system and the pool can open.