3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired.
INCREASE FLOW RATE TO AT LEAST 100 GPM.
Facility Type: Spa
[?] Inspection Type: Standard
Inspection Date: 13-April-2023