[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(c) / Minimum disinfection residual shall be maintained as required.
Critical Chlorine level in pool was ZERO, pool was being operated with bathers in the water.
Pool was closed. Not to re-open until chlorine level is above 1.0 ppm.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 20-July-2016

Comments
Hastings Pool Co. called / Cl level up to 5.0 / OK to re-open