No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 12-April-2022
Comments |
---|
Pool was not open at the time of inspection. BEFORE REOPENING CORRECT THE FOLLOWING: -FLOW RATE MUST BE BETWEEN 27 AND 68 GPM -THE FREE CHLORINE LEVEL MUST BE AT LEAST 1 PPM -THE ORP LEVEL MUST BE 650 MV OR MORE -AN EQUIPMENT REPLACEMENT NOTIFICATION FORM MUST BE SUBMITTED TO ODH FOR THE REPLACEMENT OF THE PUMP -TEST AND RECORD THE WATER TEMPERATURE DAILY, THE ALKALINITY WEEKLY, AND THE ACC FLOW SWITCH FUNCTION MONTHLY -REPLACE THE MISSING LADDER STEP TREAD -REPAIR/REPLACE THE EMERGENCY PHONE |