[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 10-June-2020

Comments
The spa did not have any water in it. Spa has not opened for the season and may not open.

FOR OPENING THE SPA:
REPLACE THE MAIN DRAIN COVERS THAT HAVE EXPIRED.
TEST THE SAFETY VACUUM RELEASE SYSTEM.
ENSURE THE FLOW RATE IS BETWEEN 50 AND 63 GPM AND THE CHLORINE LEVEL IS AT LEAST 2 PPM.
ENSURE THE SKIMMER EQUALIZER OUTLET IS PLUGGED OR COVERED WITH A VGB APPROVED COVER.
POST A PUMP CURVE FOR THE SPA JET PUMP IN THE EQUIPMENT ROOM SO YOU CAN DETERMINE THE FLOW RATE.