[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Repeat Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. INCREASE THE FLOW RATE TO AT LEAST 100 GPM. Correct By: 23-Mar-2023


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 20-March-2023

Comments
The Certificate of Compliance for the main drain covers is available in the equipment room. Our record show that the main drain suction outlet covers (AquaStar WAV9 x 8) were installed 1/24/2020. The covers have a 5 year life span and must be replaced before 1/24/2025.