[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat Required meters and gauges were not maintained or were not functional while the pool is in operation.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. REPAIR FLOW METER
3701-31-04 (C)(3) / Total alkalinity is at or greater than 60 ppm
Repeat Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm. INCREASE ALKALINITY
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly. TEST ACC MONTHLY Correct By: 26-Jul-2019


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 24-July-2019