No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 11-July-2023
Comments |
---|
-Observed a new flow meter being installed towards the end of the inspection. -The operator was observed accurately testing the automatic chemical controller during the inspection. -Noted uneven areas in the patched concrete on the pool deck. Ensure the pool deck is free of trip hazards. |