No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 03-September-2020
Comments |
---|
Pool was not open at the time of inspection. Operator indicated that the pool will reopen on a limited basis starting next week. REMOVE THE FUNNEL FROM THE FILL LINE WHEN NOT FILLING REPAIR VALVE ON THE PROBE LINES REPLACE THE EXPIRED REAGENTS INCREASE THE FLOW RATE TO BETWEEN 54 AND 98 GPM. |