3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
ORP reading was below 650 mv
Have the ACC unit inspected to determined why the ORP is low.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 22-August-2018
Comments |
---|
Corrections made since the last inspection dated 7-27-18 -depth markings are provided within 25 ft of each other -ACC function test is recorded THE FLOW RATE IS BELOW THE REQUIRED LEVEL OF 344 GPM. HOWEVER, BECAUSE OF THE AGE OF THE POOL, IF THE POOL CHEMISTRY IS ACCESSIBLE THE FLOW RATE CAN BE ACCEPTED. |