[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(e) / Automatic Chemical Controller (ACC) shall function properly.
Critical Automatic Chemical Controller (ACC) was not functioning properly at the time of the inspection. THE ACC FLOW SWITCH WAS NOT WORKING.
Ensure that the ACC unit is functioning properly. REPAIR THE ACC FLOW SWITCH. Correct By: 22-Dec-2023
3701-31-04 (B)(4)(c) / SVRS/APSOS/ACC test results/ service records are maintained
Repeat SVRS test results records were not maintained.
have the SVRS tested immediately and provide documentation of the test results. TEST THE SVRS AND RECORD THE RESULTS ON THE LOG SHEET. A SHOUT OFF VALVE CAN BE INSTALLED BEFORE THE PUMP TO SIMULATE A BLOCKING OF THE MAIN DRAINS. THE OTHER METHOD FOR TESTING THE SVRS IS TO PLACE A MAT OVER THE DRAINS. Correct By: 22-Dec-2023


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 20-December-2023