3701-31-04 (B)(4)(a)(vi) / Total alkalinity is tested weekly
Total alkalinity was not tested weekly.
Test total alkalinity at least once/week.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.
Facility Type: Special Use
[?] Inspection Type: Standard
Inspection Date: 26-August-2019