3701-31-04 (A) / Approval shall be obtained for any construction or alterations of a public swimming pool.
Equipment, at a public swimming pool, was changed/altered without obtaining approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN). Stenner 45M5 disinfection pump was replaced with a FlexFlo A1N30A-7T pump
Obtain approval from the Ohio Department of Health (ODH) by submitting an Equipment Replacement Notification (ERN) before operating pool. SUBMIT AN ERN TO ODH FOR THE DISINFECTION CHEMICAL FEEDER PUMP REPLACEMENT. Correct By: 01-Jul-2022
3701-31-04 (B)(6) / Equipment is maintained per manufacturers specifications.
Equipment was not maintained per manufacturers specifications. Two weirs missing in the skimmers.
All equipment must be maintained in accordance with the manufacturers specifications. REPLACE THE 2 MISSING WEIRS IN THE SKIMMERS. Correct By: 29-Jun-2022
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat Required meters and gauges were not maintained or were not functional while the pool is in operation.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. REPAIR FLOW METER. Correct By: 06-Jul-2022


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 28-June-2022

Comments
DECK REPAIR NEEDED BY THE STEPS. SMALL CONCRETE DAMAGE.

Safety Data Sheets (SDS) are kept in the equipment room and Personal Protective Equipment (PPE), chemical gloves and goggles, are available for handling chemicals.

Current Certificate of Compliance is not available for the main drain cover. One is supplied with this report. Keep a copy at the facility for future review. Our records show that the main drain suction outlet covers (AquaStar A10RCFR) were installed on 6-29-21. The cover have a 5 year life span and must be replaced before 6-29-26. The cover has a flow rating of 170 gpm. Three drain covers are in place.

The operator was observed performing onsite chemical tests appropriately and is aware of the acceptable parameters and necessary corrective actions.