3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
INCREASE THE FLOW TO 84 GPM OR THE TOTAL POOL VOLUME DIVIDED BY 120 GPM. Correct By: 15-May-2019
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 17-August-2018
Comments |
---|
NO VIOLATIONS OBSERVED |