[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(6)(c) / Cross connection hazards shall be prevented.
Cross connection hazards were present.
Remove all cross connection hazards from the pool area. REMOVE THE PLASTIC BOTTLES FROM THE FILL WATER LINES TO PROVIDE AN AIR GAP. Correct By: 06-Apr-2018
3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve. INCREASE THE FLOW RATE TO AT LEAST 26 GPM. Correct By: 06-Apr-2018
3701-31-04 (B)(6)(j) / All SVRS devices are maintained/ functional and tested
Critical The SVRS was not tested and recorded.
TEST AND RECORD THE SVRS AT LEAST MONTHLY. Correct By: 06-Apr-2018
3701-31-04 (B)(6)(k) / Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Critical The equalizer line from the skimmer is not covered with a VGB compliant cover.
PLUG THE EQUALIZER LINE FROM THE SKIMMER AT THE POOL WALL OR INSTALL A COMPLIANT COVER. Correct By: 03-May-2018
3701-31-04 (C)(3) / Total alkalinity is at or greater than 60 ppm
Repeat Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm. INCREASE ALKALINITY. Correct By: 06-Apr-2018
3701-31-04 (C)(7) / Spa water temperature is less than 104 degrees Fahrenheit/ thermometer is provided
The spa water was 107 degrees.
DECREASE THE SPA WATER TEMPERATURE TO 104 OR BELOW. Correct By: 06-Apr-2018
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly. TEST AND RECORD THE ACC FUNCTION AT LEAST MONTHLY. Correct By: 06-Apr-2018


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 05-April-2018